Free construction estimate template

A construction estimate broken down by trade, from demolition through framing, rough-ins, drywall and finishes, with a contingency line. Fill it in and print it or save it as a PDF, free.

Prepared for

Job

DescriptionQtyUnitRateAmountRemove
$2,400.00
$4,800.00
$5,200.00
$6,800.00
$1,920.00
$8,320.00
$7,200.00
$900.00
$5,000.00

Terms

Subtotal
$42,540.00
13%
$5,530.20
Total
$48,070.20
20%
$9,614.04

Accepted by

Signature

Date

Worked example

Construction estimate example

Basement finish, 800 sq ft, one bathroom. The rates are round example figures to show the layout, not a price for your area or ours.

Example construction estimate, 13% tax, 20% deposit.
LineQtyRateAmount
Demolition and disposal1 lot$2,400.00$2,400.00
Framing, labour and materials800 sq ft$6.00$4,800.00
Electrical rough-in and finish, licensed1 lot$5,200.00$5,200.00
Plumbing rough-in and fixtures, bathroom1 lot$6,800.00$6,800.00
Insulation and vapour barrier800 sq ft$2.40$1,920.00
Drywall, tape and finish2600 sq ft$3.20$8,320.00
Flooring, supplied and installed800 sq ft$9.00$7,200.00
Permits and inspections1 lot$900.00$900.00
Contingency, 10%, used only with your approval1 lot$5,000.00$5,000.00
Subtotal$42,540.00
Tax 13%$5,530.20
Total$48,070.20

How do you write a construction estimate?

Go through the job in the order it gets built: demolition, framing, mechanical rough-ins, insulation, drywall, finishes. Give each stage its own line with the quantity and rate, or a lump sum where a subcontractor quoted one. Then add permits, site supervision and a contingency. The order matters, because it is also the order the client will see the money go.

Why is there a contingency line?

Renovations open walls, and walls hide things: old wiring, a sagging joist, a drain at the wrong slope. A contingency of 10 to 15 percent, written on the estimate and spent only with approval, turns the surprise into a decision the client already agreed could happen. Hiding it inside other rates gives you the same money and a worse conversation.

Construction estimate or quote?

On anything with hidden conditions, estimate. On new work where you control every variable, quote. Plenty of builders do both on one job: a fixed quote for the known scope, and estimated allowances for the unknowns. The template handles either. Change the word at the top of the sheet.

How do I turn this into a PDF?

Fill in the sheet, press "Print or save as PDF", and pick "Save as PDF" (or "Microsoft Print to PDF") as the printer. Only the sheet prints: the page around it, the buttons and the remove marks are left off. On a phone, the share button in the print preview sends the PDF straight to email or WhatsApp.

When a PDF is not enough

Know when the client opened it