Free tool · no email required

Electrical Work Quotation Format (Free, GST, India)

A quotation for house or shop wiring, priced per point, with the board, earthing, AC points and testing on their own lines. Labour and material are both 18 per cent, so one rate covers the whole quote.

Your quotation

Line items

Download: Word · Excel · PDF

What goes into a Electrical work quotation?

List each job or item on its own line with the unit it is priced in, so the client can check the arithmetic.

  • Price per light, fan or power point, and say whether it is concealed or surface wiring.
  • Wire size and brand: 1.5, 2.5 and 4 sq mm copper, ISI-marked.
  • Distribution board: number of ways, MCB and RCCB ratings.
  • Earthing pits, AC points and any heavy load on its own line.
  • Testing and commissioning, and what the client must arrange: chasing repair, power cut, permissions.
Filled example of the Electrical work quotation format: line items, GST split and total on one A4 page

What GST rate and SAC code does Electrical work take?

Wiring and fitting works come under SAC 9954 (construction services) at 18 per cent, and the cable, switches and boards supplied with the work are 18 per cent too, so one rate is enough on one quotation. A client in another state is billed IGST at 18 per cent instead of CGST 9 plus SGST 9.

Confirm the SAC or HSN code and the GST rate with your accountant before you send a quotation. The codes and rates shown here are examples for the trade, not tax advice, and the rates in the line items are illustrative: replace them with your own.

Quotation questions

What GST rate applies to electrical wiring work with material?

18% (9% CGST + 9% SGST, or 18% IGST) under Heading 9954 for labour and for the wiring material supplied with it, as the rate is 18% for both. Source: Notification 11/2017-CT(Rate) as amended by 15/2025.

Is a quotation the same as a GST tax invoice?

No. A quotation is an offer of price. The tax invoice is issued under Section 31 of the CGST Act with the particulars in Rule 46 (supplier GSTIN, consecutive serial number up to 16 characters, date, HSN/SAC, taxable value, tax rate and amount, place of supply, signature). Source: CBIC Rule 46.

Which HSN or SAC code and GST rate should the electrical work quotation show?

SAC 9954 (construction services) at 18%; cables, switches and boards supplied with the work are 18% in the same schedule.

Want your own website on this quotation?

Next

Send quotes from your own website, not a PDF in WhatsApp